41. Jaw angle 3 deg.more than anglepins(<25 degree). 斜面角度要比行位斜边角度大3度(<25度)。
42. Keep enough space to run waterline atslide /lifter/majorinserts. 在行位、斜顶、主要镶件处保留足够位置(空间)布置水槽。
42. Lifter angle less than 15 degree. 斜顶角度小于15度。
43. Lifter rods dia, less than 1". 斜顶杆直径不能少于1"。
44. Limit switch in tact and protected. 是否已安装限位制?
45. Moldbase and steel dimensioned. 模坯和钢料号的标注。
46. Minimum 5 deg.for shut-off. 斜顶镶件最小5度插穿。
47. Mechanism for sequence?动作机构是否正确?
48. Mold safety straps installed andpainted red?是否已安装安全带及喷上正确颜色在模坯上?
49. Mould flow and simulation should becarried out for the bestgate location, filling analysis, pressure distributionand heat distribution. 适宜应用模拟的模具注塑过程,注射分析、压力分布及温度分布以确定最佳入水位置、流道尺寸和疏气位置等。
50. Mould should be designed with maximumcooling and withappropriate amount of ejection points. 模具在设计上要做到尽快冷却,上、下内模高温点应该有个别的冷却,应有适量顶针。